Maintenance contents of cable channel

1. Replace the damaged well cover, cover plate and protection plate, and complete the missing well cover, cover plate and protection plate.
2. Maintain the working shaft stop.
3. Clean up the water and debris in the passage.
4 stairs (ladder) for tunnel maintenance personnel entering and leaving the shaft

5. Maintain the ventilation, lighting, drainage and low voltage power supply system in the tunnel.
6. Maintain fire prevention and isolation facilities and fire fighting facilities in cable trench and tunnel.
7 prune and cut branches and vines with insufficient safety distance around AAAC Cable terminal tower (pole) and T-joint platform.
8 repair the grounding down lead with loose connection, poor grounding, corrosion and other defects.
9 replace the missing, faded and damaged stakes, warning signs and signs, and timely correct the inclined stakes, warning signs and signs.
10. Carry out anti-corrosion treatment for corroded cable support, and replace or repair the missing, damaged and severely corroded support parts.
11. Bailey frame, I-beam and other facilities can be used to protect the cable trench in operation, and the suspension and support protection shall be well done. When the suspension protection is carried out, the cable trench body or row pipe shall be protected as a whole, and direct suspension of bare cables is prohibited.


12. If the cable passage in the green belt or sidewalk is changed to slow lane or fast lane, it should be relocated. Before the relocation, the relevant parties should be required to take reinforcement measures according to the load-bearing road standard to protect the working shaft, drainage pipe and cable trench.
10.2.13 when there are excavators, cranes and other large machinery passing through the non load bearing AAC Cable channel, the relevant parties shall be required to take protective measures such as setting steel plates above, and the protective measures shall prevent noise from disturbing the residents.
10.2.14 if the elevation of the working shaft or trench body is inconsistent with the surrounding due to the change of the environment of the cable passage, the elevation of the working shaft or trench body shall be adjusted by prefabricated shaft or cast-in-place method.